CEIG CO-ORDINATION WORK:
Through our strong network and experience, we provide consultancy for CEIG permission through coordination with Electrical inspector’s office and help in documentation and processes.
According to the central electricity authority regulations any institution having an electrical connection or apparatus of up to 650 volts needs to follow the safety guidelines as described in the regulation but those who are operating any electrical installation of 650V and more need to obtain an approval from the electrical inspector. It is granted only after due inspection by the authorities.
- SOLAR POWER – MORE THAN 100KW CAPACITY
- CAPTIVE POWER PLANT – MORE THAN 500KVA
- POWER SYSTEMS – MORE THAN 33 KW
CEIG DOCUMENTS
- SINGLE LINE DIAGRAM
- EQUIPMENT LAYOUT DRAWING
- EARTHING LAYOUT DRAWING
- KEY PLAN
- PREVIOUS APPROVALS FOR EXISTING INSTALLATION
- EARTHING RESISTANCE CACULATION
- FAULT LEVEL CALCULATION
- PERMISSION FROM THE LOCAL OWNER
- ROUTE MAP AND LINE CROSSING DETAIL
- POLE OR TOWER STRUCTURE DRAWING
- CABLE DUCT AND CROSS SECTION DETAIL
- DETAILS OF CAPTIVE GENERATING PLANT
- PURCHASE INVOICE
- LOAD LIST
- COPY OF ELECTRICITY BILL
- NOC FROM LOCAL AUTHORITY
- PV CELL CALCULATION
- COPY OF GEDA SANCTION LETTER
- SANCTIION LETTER